Moor Green Lakes Group

Reserve car park and closing time  click here.    Group Visits please  click here.

2026 2025 2024 2023

Updates from our volunteers - 2026


Tuesday 11th January 2026 - Hedge-laying and Coppicing

A good turnout of 25 volunteers. Firstly, there was the annual task of continuing the hedge-laying from the river towards the car park; this time starting at Colebrook Hide. Secondly, further along the path, towards the river, other volunteers worked in two coupes coppicing and, where necessary, pollarding (usually hawthorn). At the same time, binders and stakes were harvested for the hedge-laying and the dead hedge.

Coppicing a Coupe

Coppicing a Coupe alongside the footpath. ©2026 Jane Heritage


Tuesday 13th January 2026 - Hedge-laying and Coppicing

More of the same on the Tuesday with the BVCP team. By the end of the day a long stretch of hedge had been laid. Two coupes started on Sunday completed and a third, further along the path, was also cleared

Hedge-layed

Results of two days of hedge-laying. ©2026 Jane Heritage

Coupe cleared

Coupe cleared creating a good view of Sandpiper Island. ©2026 Jane Heritage


Sunday 8th February 2026 - Hedge-laying and Coppicing

After days and days of rain we thought the work party was doomed. But no, the flooding disappeared and the day was dry. Adele, John and Tony worked with other volunteers to continue the hedge-laying started in January. Dave, Roy and Mike harvested stakes in a nearby coupe. Everyone else from the large team of 24 worked on coppicing two coupes either side of Moulsham Bridge. Here, binders for the hedge-laying were harvested.

Completing the hedge-laying

Adele, John and new volunteer Pauline, completing the hedgelaying. ©2026 Jane Heritage

Happy volunteers

Some happy volunteers in a cleared coupe. ©2026 Jane Heritage


Tuesday 10th February 2026 - Coppicing coupes along the river path

The BVCP group of volunteers together with Rangers Matt and Sara met at the seat overlooking Grove Lake. Some volunteers completed the two coupes started on Sunday, finishing before lunch with Sara using a chainsaw to fell the larger trees. Further along, towards Grove Lake seat, two more coupes were tackled. It was a race against time to finish the last one as the threatened rain had arrived.

Colebrook Lake South

A good view of Colebrook Lake South from near Moulsham Bridge. ©2026 Jane Heritage

Finishing the Coupe

A rush to finish the coupe before the end of the day. ©2026 Jane Heritage

All the planned work was completed. In addition, a repair was carried out at the dog steps, damaged in the recent floods. Two holes in the bridlepath near the outlet flap from Colebrook Lake South were filled and Nick repaired a nearby area of bank erosion.


Sunday 8th March 2026 - Coppicing coupes along the river path

The weather was much improved by the time March arrived, to the relief of the 25 volunteers who turned up to continue working in coupes along the river path. The group met at Grove Lake seat. Tony, with the help of Roy and Dave, reinforced the leaning fence near Grove seat. Not before time when some of the cows turned up rather unexpectedly having gained access through a gate that had mysteriously been left open. Three coupes along the river path were given their 10 yearly ‘haircut’ and dead hedges built

Most of the volunteers

Most of the Sunday volunteers. ©2026 Jane Heritage

Tackling a Couple

Tackling a very overgrown couple. ©2026 Jane Heritage


Tuesday 10th March 2026 - Coppicing coupes along the river path

Ranger Sara and the BVCP group of volunteers met at the viewing screen overlooking Grove Lake. Four coupes were tackled; three cleared to expose the whole area down to the lake, a fourth cleared enough to let in more light but leaving a large fallen tree shielding a rather nice, secluded area on the edge of the lake.

Clearing a couple

Volunteers working to clear a couple. ©2026 Jane Heritage

One set of dog steps into the River Blackwater was becoming eroded at one end where dogs found it easier to get in and out of the river. Access to this end section was prevented using hazel stakes and binders filling the centre with gravel from the river then brash.

Reinforced dog steps

Reinforced dog steps. ©2026 Jane Heritage


Sunday 26th July and Tuesday 28th July 2026 - Fencing

Small work parties worked on both days. Firstly, the rotting gate and adjoining gate post leading into the reserve were replaced. Some repairs were made to the adjoining wooden fence but still more to do. On the Tuesday work was completed in the car park replacing rotten posts and rails and creating a new permanent access onto the bridle path.

New gate

New gate and post installed. ©2026 Jane Heritage


Sunday 13th September 2026 - Grove hide and viewing screen

This is always the time when the volunteers tackle the reeds in front of Grove Lake hide and any growth in front of the viewing screen. These tasks ensure a good view of the lake during the winter when many birds visit Moor Green. Amongst the reeds a beautifully woven reed warbler’s nest was found, their song can be heard from the hide in the summer months.

Cutting the reeds and then removing it is hard work but the 20 volunteers very quickly create an amazing view of the lake.

Volunteers tackling reeds

Volunteers tackling the reeds in front of Grove hide. ©2026 Jane Heritage


Tuesday 15th September 2026 - Working near the birdfeeder

Tuesday is a BVCP work party day. The bird feeder paddock was given its annual hay cut using the power mower and the cuttings stacked nearby providing a cosy a home for many creatures.

The area in front of Colebrook hide was cleared, also a nearby scrape and some shoreline willow. This newly exposed scrape was popular with a snipe during the hide open day in October.

Scrape clearance

Clearance of the scrape viewed on the left of Colebrook hide. ©2026 Gillian Stewart


Sunday 12th October 2026 - Working on Long Island and Tern Island

The pontoon was put in place and a team of volunteers worked on Long Island, continuing the work started last year. The first task was to cut a way onto the island through the dense bracken. The large scrape to the right of the hide, an idea sight for visiting waders, had become obscured with new growth round the edges. This was quickly cleared. Other volunteers were taken over to Tern Island and, by lunchtime, it was cleared back to just gravel and everything transported back to shore by boat.


Tueday 14th October 2026 - Working on Long Island

After a short break until, a shower passed, a large BVCP team continued the work started on the Sunday working on Long Island. Some worked in the scrape to clear the rushes, others cleared growth on the south side of the island and Sandpiper Island was also given another trim.

A small team went to the north of Colebrook Lake North and trimmed bramble ready for the Robomower arriving the next day.

Cleared Long Island

Colebrook hide view of cleared Long Island scrape. ©2026 Jane Heritage


Wednesday 15th and Thursday 16th October 2026 - Arrival of the Robomower

Rangers Sara and Matt spent two days clearing the meadow alongside the path to the river, the tracks round the north of the reserve and the meadow near Goose Island where the work parties are to be based in December.

Ranger Sara with the Robomower

Ranger Sara with the Robomower. ©2026 Jane Heritage


For previous installments click here

If you are interesting in volunteering or for more information on planned work click here


Back to the top